The Parsley Bay bridge involved the anchoring and concrete encasement of new lateral suspension wires, the safe removal of lead paint, the removal and replacement of all corroded metal structural components and fixings, the replacement of the timber bridge decking boards and the preparation and installation of new surface painting to the entire bridge. The works was completed in stages from an encased suspended working platform that moved below the bridge from one end to the other allowing our staff to work safely at all times.