This was a 2 stage construction to extend and upgrade an existing home in Bellevue including extension, major landscaping, adding a swimming pool and double garage. Designed by Michael Folk Architects the construction period was under 10 months.
This construction was completed in two stages to ensure site access was maintained for the entity.
Stage 2 front works involved detailed rock excavation, contiguous piling, the installation of new concrete entry stairs, a new concrete garage, the supply and installation of a vertical lift, waterproofing, travertine tiling and landscaping.
© Copyright Enter Building Group 2019